This lift station was designed to meet the low sewage flow requirements of a municipal lift station for a new residential development. The duplex pump configuration, solids-handling pumps, and inlet-line drop bowl provide suitable preventative measures for a reliable and long-term wastewater lift station. The controller is a PLC type designed with a pressure transducer for primary level sensing and a two float system for backup. The entire electrical was configured for Ethernet communication and alarm notification output to an existing SCADA system.
Trammell Crow Residential| San Diego, CA| 211 GPM - 23.6' TDH
Romtec Utilities supplied a wastewater lift station to service a new apartment building by Trammell Crow Residential in San Diego, California.
University of California | 720 GPM - 43.1' TDH
Adapting to the rising numbers of students seeking a higher education, UC Merced expanded their campus, and needed a wastewater lift station to accommodate new mixed-use residence halls.
Huntington Beach, California Housing Development Stormwater Lift Station
460 GPM
14′ TDH
Huntington Beach, California Housing Development Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS New Housing Development Stormwater Lift Station A new housing development stormwater lift station was needed for a construction project in Huntington Beach, California. This was for a new housing development called Seamark that involved 85 homes being built next to Gisler Park. Fuscoe connected us with the project, as they were the civil engineer and brought us into contact with ...
City of Portland, Oregon - Wastewater Pump System
The Halsey 28 apartments needed a new wastewater pump system as part of the project which Romtec Utilities designed and supplied.





