Stanislaus County – Package Wastewater Lift Stations
Wastewater Pumping System Project Description
Vernalis, California is in the central valley south of Sacramento and east of San Francisco. Located along Interstate 5 this area encounters travelers moving north and south through the region.
Caltrans needed to upgrade their Westley Safety Roadside Rest Area (SRRA) buildings to expand and update the Northbound and Southbound facilities. The aging facilities and capacity limits needed to be replaced as the buildings were reaching 47 years old.
Romtec Utilities was contacted by ReCom Development who was bidding the project as a General Contractor. We developed a package for two wastewater lift stations and presented it to ReCom then contracted with Capital Flow to meet the Disabled Veteran Owned Company requirements on this project. ReCom provides development services out of Bishop, CA.
Westley SRRA is located within Stanislaus County in a rural region of the Central Valley, lying approximately 14 miles south of the city of Tracy and 28 miles south of the City of Stockton. The nearest large communities to the south are Los Banos and Bakersfield at distances of 49 miles and 210 miles, respectively.
Westley consists of two SRRA units serving the northbound and southbound directions of travel on I-5.
Westley Northbound has a total of 51 parking spaces, including 33 auto and 18 truck/bus spaces. Westley Southbound has a total of 50 parking spaces, including 34 auto and 16 truck/bus spaces.
Capital Flow Company was the purchasing supplier from Romtec Utilities on this project. Capital Flow Company is a Disabled Veteran Owned Company providing contracting services based out of Sacramento, CA.
Romtec Utilities designs and supplies wastewater lift stations for various projects all over the country. We have the design team to create a pumping system that fits your project needs and the needs of the site location. Contact us today to see how we can help get started on your next pump station.
Wastewater Pumping System Design
The Wastewater Lift Station Features (#1):
– Fiberglass 6′ ID x 13.02′ deep wet well.
– Precast 504 Valve Vault
– 4″ Piping
– Duplex Flygt 3hp Submersible Pumps
Wastewater Lift Station (#2):
– Fiberglass 6′ ID x ~13′ deep wet well
– Precast 504 Valve Vault
– 4″ Piping and Valves
– Duplex Flygt 3hp Submersible Pumps
DUTY POINT: 200gpm @ 21′ TDH (For Both)
What Romtec Utilities Provided
- Pump Station Design & Engineering
- Package Pump Station Supplier
- Package Pump Station Manufacturer
- On-Site Construction Adviser
- On-Site Start-Up Management
200 | 21′ |