This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
Airway Industrial Park| Otay Mesa, CA | 2020 GPM - 14.4' TDH
The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.
Microsoft | Silicon Valley, CA | 400 GPM - 20.5' TDH
Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.
Indian Health Service | Davis, CA | 215 GPM - 18.6' TDH
The IHS is the Federal Health Program for American Indians and Alaska Natives, and worked with Cecil & Cecil in a larger project to construct a new in-patient clinic for substance abuse.





