City of Camas Washington

The City of Camas | Camas, WA | 126 GPM - 206' TDH

jweddell100gpm - 300gpm, Municipal Collection, Odor Control, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows. The wastewater is pumped at 120 gpm 10,000 lineal feet of 10” force main against 206’ TDH with 23 hp high head submersible solids handling pumps. A sheltered control panel utilizes an intrinsically safe barrier for in-well electrical, such as the pressure transducer and conductive probe for primary and backup level controls.