Hillsboro, Oregon – Data Center Wastewater Lift Station
This data center wastewater lift station was for a T5 Construction Services data center in Hillsboro, Oregon. Romtec Utilities designed the wastewater lift station to meet the site requirements and project needs, through our experience working with data center developers across the U.S.
Romtec Utilities has a lot of experience working on data center pumping systems. As a packaged pumping systems company we design, manufacture, and supply the complete system. Romtec Utilities handles the entire process from design, to manufacturing, to supply.
This data center was in Hillsboro, the fifth largest city in Oregon, situated just to the west of the Portland metro area.
Hillsboro is home to many technology companies and is known locally as the silicon forest, a nod to Silicon Valley. Intel has a major campus in Hillsboro where it has its largest facilities. The city is also home to the Hillsboro Hops, a minor league baseball team who plays in the Northwest League.
Data Center Pumping System
T5 Construction Services LLC was the end owner of this wastewater pump station that was needed for the data center. T5 Construction Services is a general contractor for data center builds — from complex ground-up campuses to retrofit and turnkey projects tailored to data center projects.
The civil engineer was Navix Engineering, who reached out to Romtec Utilities looking for assistance with the design of a wastewater lift station for an industrial project for T5 data centers in Hillsboro, Oregon.
Navix has previously worked with Romtec Utilities on another data center project, the DLR OR2-PDX12. Navix provides site and civil engineering services with offices in Bellevue, Washington, and Clackamas, Oregon.
Romtec Utilities worked through the design for the system with Navix, including several revisions to the preliminary design. The Romtec Utilities system was specified as the basis of the design and sample drawings provided by Romtec Utilities were used in the bid plans.
Fortis Construction was the general contractor while Coffman Excavation was awarded the utility work and installed the wastewater pump station that Romtec Utilities designed and supplied.
Data Center Pump Station
The wastewater lift station has a precast 5-foot inner diameter by 15-feet deep wet well, precast 660 valve vault, duplex 3-horsepower Ebara submersible pumps, E&H FMX21 pressure transducer, NOLTA MS1 floats (2), with the control panel housed in a NEMA 4 painted steel enclosure. The duty point is 110 gallons per minute at 21.8′ total dynamic head.
Coffman has installed other pumping systems on Romtec Utilities projects including the PDX TCORE and Port of Portland parking structure development. Coffman provides site preparation, street construction, utility installation, along with other construction services.
Data Center Lift Station
If you are looking at developing a data center and need a stormwater or wastewater pump station, Romtec Utilities can provide the design and supply of the system. We have an experienced team providing hundreds of pump systems for private companies and governments across the country.
Romtec Utilities has experience working on a variety of data centers pumping projects, as we design, manufacture, and supply pump systems for this growing infrastructure across the county. To meet pumping needs for each project, the Romtec Utilities team collaborates with the owners, engineers, and developers to come up with a wastewater lift station that will meet the pumping needs of the data center and site.
Common Types of Data Center Pumping:
- wastewater
- stormwater
- data center cooling waste
- industrial process water
Romtec Utilities services offered
We understand how the different processes work within data centers and how to design a specific pumping system to meet the needs of that project.
At Romtec Utilities we send a installation tech to the site upon installation to ensure the system is installed per the design. They also provide commissioning of the system and train all personnel on the operations and controls of the system. This ensures the system operates as intended and provides a high-level training on the maintenance and operations of the wastewater lift station.
We also handle a majority of the manufacturing of the system prior to delivery to ensure quality control and system operation. We manufactured the precast 660 valve vault on this project; by assembling all the valves and components within this vault so it was ready to drop into the ground for installation. This saves time, money, and equipment needed for the installation of the system. All this savings is passed on to the customer.
And it makes installing the system much easier.
As the supplier of the complete wastewater lift station for a data center, we provide a robust warranty which adds value back to the customer. Romtec Utilities handles the entire process for you as the single source entity, so you don’t have to contact various suppliers or companies.
We can design a system that has a variety of controls and alarms that meet your ownership or maintenance preferences. Since we design the system, we can cater to your preferences as the lift station is monitored and watched by the maintenance personnel or third-party team. This can ensure that if an issue does arise, they will be notified immediately so they can properly handle the circumstance.
What Romtec Utilities Provided
- Pump Station Design & Engineering
- Package Pump Station Supplier
- Package Pump Station Manufacturer
- On-Site Construction Adviser
- On-Site Start-Up Management
| 110 | 21.8 |
| GPM | TDH |