IBM Resiliency Services|Boulder, CO|270 GPM - 36' TDH

jweddell100gpm - 300gpm, Data Centers, Mountain, Replacements & Retrofits, Wastewater

The IBM Boulder Data Center needed to replace a wastewater lift station with a new system to handle medium flows of wastewater generated at the facility. A precast concrete sump includes a pedestrian rated hatch with a safety grate for reliable fall protection. Two, Ebara 5 hp pumps were included in the design for redundant pumping capabilities, and a prefabricated valve vault structure contains check valves and control valves. A UL listed control panel with phase monitoring was engineered in a NEMA 4X stainless steel enclosure for installation outdoors.

City of Port Orchard Washington

City of Port Orchard|Port Orchard, WA|200 GPM - 64' TDH

jweddell100gpm - 300gpm, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development. Two submersible solids handling pumps pump to a below-grade valve assembly containing the lift station valves and access ports. A sheltered PLC control panel utilizes a pressure transducer for primary liquid level-sensing with backup float controls. The panel is tied to an onsite generator for emergency backup power.