This replacement wastewater lift station was designed to meet the medium sewage flow requirements of this federal training facility. Submersible solids-handling pumps in a duplex configuration pumps the effluent through in-well valves and out a three-inch force main. An outdoor alternator panel handles the controls for this package lift station. It was designed with floats for liquid level sensing and a basic alarm. The wet well is accessible with a traffic-rated hatch.
Lennar Communities|Bakersfield, CA|297 GPM - 57' TDH
This package wastewater lift station handles sewage flows from this large residential development neighborhood. Duplex submersible solids handling pumps pump a high flow rate from this 30’ deep wet well. The wet well includes an interior fiberglass lining and exterior coating. A below grade valve vault provides easy access to the valves, ports, and gauges. For level controls, the outdoor control panel includes a pressure transducer and floats for backup. An autodialer and backup generator are also included in the panel design and supply.
Del Norte County | Eureka, CA | 220 GPM - 36' TDH
To extend the sewer system for Crescent City in Del Norte County, this sewage lift station was added to a new gravity line and force main. Duplex submersible chopper pumps pump the sewage to an existing gravity line and on to treatment. An easy-to-access below grade valve assembly contains the check and plug valves. An outdoor PLC panel is connected to a customer-supplied generator and is also protected by a customer-supplied shelter. Primary liquid level sensing is by a pressure transducer with floats as a backup.
Coyote Springs Development|Moapa, NV|121 GPM - 55' TDH
This package lift station system was designed to meet the medium sewage flows of this new residential development and private golf course. Submersible solids handling pumps in a duplex configuration manage the influent for this deep well, and an above-grade valve assembly maintains proper discharge operations. An outdoor UL listed control panel includes float controls and a basic alarm. This package lift station was one of the first systems installed for the Coyote Springs development after government approvals in 2010.
Seattle Parks and Recreation|Seattle, WA|145 GPM - 20.8' TDH
A renovation of South Lake Union Park required a package lift station configured to meet the medium sewage flow requirements for a municipal and commercial wastewater system. Submersible solids handling pumps in a duplex configuration are protected from turbulence and cascading influent by a drop bowl. A separate below-grade valve vault holds the valves, gauges, indicators, and actuators. A UL listed control panel utilizes float controls for primary and backup liquid level-sensing and is housed in a nearby control building.





