The Green Ridge Campground purchased this lift station replacement that was configured to meet the medium sewage flow requirements of the site. Submersible solids handling pumps in a duplex configuration are protected from influent and turbulence by an inlet line drop bowl. An in-ground valve vault provides easy access to the system valves, actuators, and access port. A UL listed control panel employs float controls for liquid level-sensing and includes an autodialer and basic alarm. The panel was installed on the exterior wall of an existing building.
Montage Healdsburg| 120 GPM - 49.9' TDH
Located in Healdsburg, California, the Montage Healdsburg, was in need of a new sewer wastewater lift station. This new resort is nestled in Wine Country, and located close to numerous wineries and fine dining that draw in visitors to Healdsburg every year.
Pacific Grove Golf Course|Pacific Grove, CA|230 GPM - 18.5' TDH
The Pacific Grove Golf Course in California needed a wastewater lift station to pump medium flows of raw sewage to an effluent treatment and recycling system. This lift station was engineered with 3 hp Ebara submersible centrifugal pumps in a duplex configuration.
Indian Springs Resort|Calistoga, CA|
The Indian Springs Resort was required to add a geothermal flow meter vault to send its used spring water to treatment at the City of Calistoga.
Indian Springs Resort|Calistoga, CA|6,800 GPM - 15.7' TDH
The Indian Springs Resort needed a new pump station designed to handle high flows of stormwater runoff from a collection storm drain.




