Sammamish Plateau Water

Pacific Properties | Sammamish, WA | 85 GPM - 75' TDH

jweddell50gpm - 100gpm, Meter Vaults, Municipal Collection, Now & Future Expansions, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

This medium flow sewage lift station was designed for a new development to meet the Sammamish Plateau Water and Sewer District lift station design standards. These standards specify a PLC controller with touchscreen HMI, SCADA options, a precast concrete valve vault, wet well, meter vault, and duplex submersible pumps. In addition to these design standards, this lift station needed to tie-in to an existing force main owned by the District. Romtec Utilities provided the tie-in force main designs and calculations as well as VFDs (variable frequency drives) to match the changing flow and pressure conditions of the existing force main.