Clark County, Washington|Vancouver, WA|198 GPM - 51' TDH

jweddell100gpm - 300gpm, Mixed Use, Municipal Collection, Pacific, Sewer System Expansion, Urban Growth, Wastewater

This package lift station was designed to meet municipal standards for medium sewage flows at this new commercial complex. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station. The below-grade valve assembly included swing check valves, a pigging port, and flow meters. An on-site permanent generator and sheltered outdoor PLC control panel provide robust and programmable lift station controls. An ultrasonic transducer and a two float backup comprise the liquid level sensing controls.

U.S. Army Base|Kalaheo, HI|74 GPM - 85' TDH

jweddell50gpm - 100gpm, Military Installations, Mixed Use, Wastewater, Wastewater Featured

Serving the US Army Base, Fort Shafter, this military neighborhood needed a lift station replacement package to be installed adjacent to the existing lift station. The Army and Romtec Utilities configured this submersible centrifugal pump station to pump the medium flow of municipal wastewater. The outdoor control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. A new generator was installed at grade above an existing generator pit. The owner supplied shelters for the panel and onsite generator.