Many projects are brought to us by either a municipality or a contractor that has been hired for the project by another agency. In the case of the Old Highway 99 project, R&G Excavating, the contractor hired by David Evans & Associates, brought the project to Romtec Utilities.
McCormick Lift Station Upgrades| Port Orchard, WA | 3800 GPM - 142' TDH
The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.
Port of Tacoma|Tacoma, WA | 1090-1430 GPM - 25.6'-31.6' TDH
The Port of Tacoma required three pump stations to send untreated stormwater through onsite water treatment systems. All stormwater that enters the marina will first travel through one of these three systems before being treated to improve the water quality at the port.
Mitsubishi Gas Chemical|Forest Grove, OR | 475 GPM - 19.7' TDH
The construction of a hydrogen peroxide refinement plant for the Mitsubishi Gas Chemical Company (MGC) required a pump station to collect and discharge stormwater to an onsite treatment system.
Northshore Utility District|Kirkland, WA| 153 GPM - 130' TDH
Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.