Romtec Utilities
(541) 496-9678
rusales@romtec.com
Contact Us
  • Water Types
    • Sewer
      • Wastewater
      • Municipal
      • Residential Development
      • Commercial Development
      • Industrial
      • Collection Systems
    • Stormwater
      • Stormwater Treatment
      • Detention Ponds
      • Commercial Development
      • Collection
      • “First Flush” Pumping
      • Flood Control
    • Process Water
      • Industrial Water
      • HRSG Pumping
      • Oily Water
      • Water Recirculation
      • Food Process
    • Potable Water
      • Domestic Booster Systems
      • Clean Water Intake
      • Water Recharge
      • Greywater Reuse
    • Other Water
      • High Temperatures
      • High/Low pH
      • Glycol Recovery Systems
      • High-Solids Water
      • Slurry/Gritty Water
      • Classified Water Conditions
  • Applications
    • Public Works
      • Municipal Lift Station
        Replacements
      • Sewer System Expansion
      • Replacements & Retrofits
      • Septic to Sewer Conversions
      • Prisons & Detention Centers
      • Municipal Collection
      • Flood Control
      • “First Flush”
      • Groundwater Reclamation
      • Booster Pump Station
      • Military Installations
      • Transportation
      • Now & Future Expansions
    • Development
      • Residential
      • Apartment Complexes
      • Stormwater Runoff
      • Detention Pond Pumping
      • Domestic Water
        Development
      • Water Reuse
      • Urban Growth
      • Booster Pump Station
    • Commercial
      • Mixed-Use Development
      • Data Centers
      • Airports
      • Hospitals
      • Prisons & Detention
        Centers
      • Landfills & Leachate
      • Equipment Washdown
      • Parking Lot Drainage
      • Ports
      • Railyards
      • Resorts/Golf Courses
      • Schools
      • Irrigation & Agriculture
      • Warehouse/Fulfillment Centers
    • Industrial
      • HRSG Blowdown
      • Power Generation
      • Oil & Gas
      • Food & Beverage
      • Pharmaceutical Waste
      • Data Center Cooling Waste
      • Corrosive/Caustic Pumping
    • Treatment
      • Treatment Plants
      • Stormwater Runoff
      • Water Reuse
      • “First Flush”
      • Scalping & Membrane
        Bio-Reactor
      • Oil/Water Separators
    • Flood Control
      • Stormwater Runoff
      • Detention Ponds
      • Municipal Collection
      • “First Flush”
      • 100-Year Storm
      • Underground Detention
  • Products
    • Pumping Systems
      • Stormwater Pump Stations
      • Wastewater Lift Stations
      • Booster Pump Stations
      • Clean Water Pumping
      • Industrial Pumping
      • Above-Grade Pump Stations
      • Irrigation Systems
      • Retrofit Systems
    • Assemblies
      • Valve Assemblies
      • Meter Assemblies
      • Skid Assemblies
      • Odor Control
      • Grinder Vault
      • Pressure Relief Vault
      • Water Control Systems
      • Deflector Panels
    • Electrical
      • Control Panels
      • Junction Boxes
      • SCADA Connect
      • Motor Control Center (MCC)
      • Disconnect Stands
    • Structures
      • Open Shelters
      • Booster Pump Buildings
      • Generator Buildings
      • Chemical Storage
      • Control Buildings
      • Control Kiosks
      • Custom Buildings – Office,
        Water Testing,
        Bathrooms, & More
    • Accessories
      • Level Sensors
      • Top Slab & Hatch
      • Cable Trays
      • Davit Cranes
      • Guide Bars & Brackets
      • Pump Elbows
    • Pumps
      • Submersible
      • Solids-Handling
      • Chopper/Cutter
      • Grinder
      • Axial Flow
      • Self-Priming
      • Vertical Turbine
      • Vertical Wet Well
      • In-Line Turbine
      • End-Suction Centrifugal
      • Split-Case
  • Projects
    • Water Type
      • Sewer
      • Stormwater
      • Process Water
      • Potable Water
      • Other Water
    • Locations
      • Pacific
      • Mountain
      • Central
      • Eastern
      • International
    • Application
      • Public Works
      • Development
      • Commercial
      • Industrial
      • Treatment
      • Flood Control
    • Industry
      • Public & Municipal
      • Contractors & Developers
      • Oil & Gas
      • Power Generation
      • Ports
      • Chemical Manufacturing
    • GPM
      • 5gpm – 50gpm
      • 50gpm – 100gpm
      • 100gpm – 300gpm
      • 300gpm – 500gpm
      • 500gpm – 1,000gpm
      • 1,000gpm – 5,000gpm
      • 5,000gpm – 10,000gpm
      • 10,000gpm +
  • Engineering & Services
    • System Design
      • Preliminary Designs
      • Budgetary Estimates
      • Sample Drawings
      • Complete Engineered Drawings
      • Full Design Submittals
      • Complete O&Ms
      • Sealed Plans
      • Full Bid Specifications
    • Electrical Engineering
      • Control Panel Design
      • Site Electrical Layout
      • Control Building Electrical Layout
      • Control Panel Repair/ Retrofit
      • Programming
      • Generator Sizing
    • Field Services
      • Training
      • System Repair Evaluation
      • System Retrofit Evaluation
      • Field Repair Services
      • Install Advising
    • Services
      • Start-Up & Testing
      • Field Evaluations
      • Repairs & Retrofits
      • Onsite Construction
      • Design Submittals
      • Prefabrication
      • Structural/Mechanical
        Integrations
      • System Commissioning
      • Shipping & Delivery
    • Procurement
      • Purchasing Cooperatives
      • Federal Contracts
      • State Contracts
      • Design-Build Contracts
      • Turnkey
  • Construction
    • Pump Stations
      • Precast Concrete Sumps
      • Steel Tanks
      • Fiberglass Wet Wells
      • Overflow Tanks
      • Below-Grade Assemblies
      • Above-Grade Assemblies
      • Control Panels
      • Odor Controls
    • Buildings
      • Building Construction
      • Shelter Construction
      • Booster Pump Buildings
      • Restroom Buildings
      • Electrical Control Buildings
      • Vehicle Storage Buildings
      • Gatehouses & Guardhouses
      • Treatment Buildings
      • SCADA & Monitoring Buildings
    • Repair & Retrofit
      • Existing Sump Retrofit and Repair
      • Top Slab & Hatch Retrofit
      • Control Panel Repair/Retrofit
    • On-Site Contracting
      • Excavation Contracting
      • Underground Construction
      • Site Grading & Paving
      • Building Demolition
      • Utility Hook-up Installation
      • Construction Estimation
      • Mechanical & Plumbing
      • Electrical Installations
      • Shoring & Dewatering
  • About Us
  • BLOG
Home Projects Central

Category Archive

Below you'll find a list of all posts that have been categorized as “Central”

UPRR Alton & Southern Yard
East St. Louis, IL
135 GPM - 69.4' TDH

August 17, 2022 1,000gpm - 5,000gpm, Central, Design and Engineering, Flood Control, Railyards, Stormwater, Stormwater Featured

This project was initially recognized as a rehabilitation project but Romtec Utilities and David Evans and Associates, Inc. determined that they needed a replacement lift station to meet their increased stormwater demands.

City of Granbury Texas

Dolce Vita Development
Granbury, TX
486 GPM - 29' TDH

March 4, 2022 300gpm - 500gpm, Central, Commercial Development Sewer, Design and Engineering, Residential, Residential Development, Wastewater, Wastewater Featured

Romtec Utilities was contacted by Texas Water Engineers (TXWE) who was the utilities engineer on the project regarding pump selection for the private development.

US Navy Logo

NAVFAC
Fridley, MN
1000 GPM - 35' TDH

November 11, 2021 1,000gpm - 5,000gpm, Central, Design and Engineering, Industrial, Military Installations, Stormwater, Stormwater Collection, Stormwater Featured, Stormwater Runoff

The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.

Crystal Creek Developers, LLC

Crystal Creek Developers, LLC
Alvin, TX
500 GPM - 26' TDH

June 14, 2018 500gpm - 1,000gpm, Central, Detention Ponds, Stormwater, Stormwater Runoff

A new mixed-use community development needed a stormwater pump station to handle medium flows of stormwater from the community.

Boardwalk Pipeline Partners

Boardwalk Pipeline Partners
Houston, TX
100 GPM - 11' TDH

April 19, 2018 50gpm - 100gpm, Central, Oil & Gas, Oil/Water Separators, Stormwater, Stormwater Collection, Stormwater Runoff

The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.

  • Page 1 of 4
  • 1
  • 2
  • 3
  • ...
  • 4
  • →

Search

Newsletter


Subscribe Today!

Request a Quote

Get Free Design Help Today!

Recent Posts

  • Smart Controls Design

    Smart Controls Design

  • What Does Romtec Utilities Prefabricate?

    What Does Romtec Utilities Prefabricate?

  • Design-Build as a Project Delivery Method

    Design-Build as a Project Delivery Method

  • How to Achieve Multiple Pumping Discharge Rates

    How to Achieve Multiple Pumping Discharge Rates

Romtec Utilities

Address:
18240 N. Bank Road
Roseburg, OR 97470

Contact Info:
Contact Us
Phone: (541) 496-9678
rusales@romtec.com
Fax: 541-496-0801

Career Opportunities

Office Hours:
7:00am-4:30pm/PT Monday–Friday.

IF YOU CALL AFTER HOURS OR HOLIDAY:
Please leave a phone message. Your call will be returned the next business day.

Products

  • Wastewater Lift Stations
  • Stormwater Pump Stations
  • Industrial Lift Stations & Reuse Systems
  • Clean Water & Turbine Pump Stations
  • Booster Pump Stations
  • Skid Assemblies

More Products

  • Control Buildings & Shelters
  • Flow Meter Vault Assemblies
  • Valve Vault Assemblies
  • Odor Control Systems
  • Inlet/ Outlet Structures
  • Component Sales
  • View Product Catalog

Services

  • LS Repair Retrofit Services
  • CP Repair Retrofit Services
  • Design/ Engineering Services





© 2000 – 2019 Romtec Utilities, Inc. All Rights Reserved

sales@romtecutilities.com | (541)496-9678

Toggle the Widgetbar