The Port of Tacoma required three pump stations to send untreated stormwater through onsite water treatment systems. All stormwater that enters the marina will first travel through one of these three systems before being treated to improve the water quality at the port.
Mitsubishi Gas Chemical|Forest Grove, OR | 475 GPM - 19.7' TDH
The construction of a hydrogen peroxide refinement plant for the Mitsubishi Gas Chemical Company (MGC) required a pump station to collect and discharge stormwater to an onsite treatment system.
Northshore Utility District|Kirkland, WA| 153 GPM - 130' TDH
Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.
Sammamish, WA| 141 GPM - 185' TDH
The construction of the Cedar Hill housing development in Sammamish, Washington required a wastewater lift station to connect new homes into the existing sewer infrastructure.
Grain Millers, Inc.|Junction City, OR| 70 GPM - 38' TDH
Romtec Utilities was contacted to design and supply a wastewater lift station for the newly constructed Northern Gold Foods manufacturing facility in Junction City, Oregon. The new system handles wastewater from both sewer lines and process water from the food manufacturing process.





