Bear River Band of Rohnerville Rancheria – Tribal Sewer Lift Station
Project Description
The Bear River Band of Rohnerville Rancheria, a federally recognized tribe of the Mattole and Wiyot peoples, purchased this package wastewater lift station for a tribal community development. The submersible pumps are located in the bottom of a 14’ prefabricated fiberglass sump, and the below grade valve assembly is located in a 5’ deep round prefabricated fiberglass valve vault. An outdoor UL listed control panel includes floats for primary and backup level controls and an autodialer for system communications.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- Lift Station Site Plan Layout Designer
- On-Site Lift Station Construction Adviser
- On-Site Start-Up Management
70 | 21.6′ |
GPM | TDH |
Why They Chose Romtec Utilities
WSI International was chosen to replace a wastewater treatment facility for the Bear River Band of Rohnerville Rancheria community. An aspect of the new treatment facility’s operation was a separate lift station to supply the wastewater flow. Working with WSI, Romtec Utilities designed, engineered, and supplied a packaged fiberglass lift station that would integrate with the WSI wastewater treatment facility. Romtec Utilities provided the design and engineering services free of charge with the purchase of the lift station supply package. Mercer Fraser Company was the selected contractor to handle the lift station installation, and Romtec Utilities provided an on-site technician to advise and support the installation process.