Bear River Band of the Rohnerville Rancheria

Tish Non Village|Eureka, CA|70 GPM - 21.6' TDH

jweddell50gpm - 100gpm, Municipal Collection, Pacific, Residential Development, Scalping & Membrane Bio-Reactor, Treatment Plants, Wastewater

The Bear River Band of Rohnerville Rancheria, a federally recognized tribe of the Mattole and Wiyot peoples, purchased this package wastewater lift station for a tribal community development. The submersible pumps are located in the bottom of a 14’ prefabricated fiberglass sump, and the below grade valve assembly is located in a 5’ deep round prefabricated fiberglass valve vault. An outdoor UL listed control panel includes floats for primary and backup level controls and an autodialer for system communications.