Orange County Water District

Santa Ana Delhi | Orange County, CA

Hannah Duncan1,000gpm - 5,000gpm, 100-Year Storm, Collection Systems, First Flush, Flood Control, Pacific, Stormwater, Stormwater Collection, Stormwater Runoff, Treatment Plants, Wastewater, Water Reuse

This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.

City of Port Orchard Washington

McCormick Lift Station Upgrades| Port Orchard, WA | 3800 GPM - 142' TDH

Hannah Duncan1,000gpm - 5,000gpm, Pacific, Replacements & Retrofits, Residential Development, Wastewater

The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.