The Romtec Utilities pump station is just the newest addition to the clean-up efforts, which began in 1981 at the NIROP site.
Airway Industrial Park| Otay Mesa, CA | 2020 GPM - 14.4' TDH
The Rockefeller Group purchased 7.81 acres of improved land in order to build the Airway Industrial Park in Otay Mesa, California.
Santa Ana Delhi | Orange County, CA
This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.
Old Highway 99 N | Roseburg, OR
Many projects are brought to us by either a municipality or a contractor that has been hired for the project by another agency. In the case of the Old Highway 99 project, R&G Excavating, the contractor hired by David Evans & Associates, brought the project to Romtec Utilities.
McCormick Lift Station Upgrades| Port Orchard, WA | 3800 GPM - 142' TDH
The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.