This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.
Orange County, California|Anaheim, CA|4,500 GPM - 32.5' TDH
To create new potable water, this lift station pumps clean stormwater from a collection/storage basin to a treatment facility. Duplex vertical turbine pumps move high flows of water very efficiently and use soft starters to reduce torque on the vertical shaft and provide additional pump diagnostics. Also included is an above-grade valve assembly on the top slab. The control panel utilizes an ultrasonic transducer for primary level controls and a pressure transducer for backup. The entire package lift station is located inside an owner-supplied control building.
Sacramento Regional County Sanitation District | 180 GPM - 27.0' TDH
Romtec Utilities supplied a wastewater lift station that will be owned and maintained by the Sacramento Regional County Sanitation District.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
Yocha Dehe Wintun Nation| 206 GPM - 142.9' TDH
The Mossy Creek project is a wastewater lift station for a new development to support the Cache Creek Casino Resort.





