Romtec Utilities designed and supplied a wastewater lift station for a new residential development in the City of Ridgefield, Washington. The development and lift station will be completed in phases to meet the growing flow rates of the service area.
Roseburg Urban Sanitary Authority|Roseburg, OR| 197 GPM - 45.3' TDH
Romtec Utilities was hired to design and supply a wastewater lift station for an industrial development in Roseburg, Oregon.
City of Stanwood|Stanwood, WA| 160 GPM - 44' TDH
The Mineral Point housing development in the City of Stanwood, Washington required a wastewater lift station to convey sewage to treatment for newly constructed houses.
City of Ashland|Ashland, OR|156 GPM - 55.7' TDH
Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.
Sammamish Plateau Water|Sammamish, WA|110 GPM - 66.5' TDH
Romtec Utilities worked with SPWSD on a similar project to develop a new submersible lift station design standard that changed from its previous wet/dry configuration pump systems.





