Two skid-mounted lift station systems retrofitted two existing stations for medium sewage flows at this federal correctional facility. Preassembled above-grade skids with Pioneer self-priming pumps in duplex configurations drop suction piping into the existing sumps to pump effluent to the existing force mains.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.
Department of Energy|Richland, WA
A secure Department of Energy facility in Richland, Washington required multiple top slabs to retrofit existing pump stations.
Santa Barbara County|Santa Barbara, CA| 60 GPM - 20' TDH
Santa Barbara County needed to retrofit an existing lift station site to effectively replace a failing system. The lift station retrofit needed to handle medium flows of municipal sewer from two inlet lines and make use of limited site space.
City of Ashland|Ashland, OR|156 GPM - 55.7' TDH
Romtec Utilities retrofitted an existing wastewater lift station to meet rising flow rates in a neighborhood area of Ashland, Oregon.