Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
Middletown Energy Center|Middletown, OH|480-850 GPM - 25'-35' TDH
Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.
Dan River Steam Station|Eden, NC|300 GPM - 20' TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.
BAE Acetic Acid Plant|Kingsport, TN|300 GPM - 30' TDH
BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.
Marathon Petroleum|Robinson, IL|75 GPM - 125' TDH
The Marathon Petroleum Refinery in Robinson, IL needed this new industrial process water pump station to handle its medium flows of highly acidic water combined with standard wastewater. A precast concrete sump included an interior Tnemec coating to withstand the water chemistry from a refinery testing lab. 11 hp Goulds grinder pumps were designed in a duplex configuration and included a factory epoxy coating to withstand the water chemistry. The pump station piping was designed with stainless steel components, and corrosion resistant floats were included as the liquid level sensing devices.