Romtec Utilities was hired to design and supply pump stations to support a combined-cycle power generation process that requires significant amounts of recirculated water to function for the Orlando Utility Commission in Orlando, FL.
Dan River Steam Station|Eden, NC|300 GPM - 20' TDH
Duke Energy replaced the Dan River Steam Station with a new gas fired power plant and needed a new pump station to handle medium flows of blow down water from the heat recovery steam generator.
BAE Acetic Acid Plant|Kingsport, TN|300 GPM - 30' TDH
BAE Systems, Inc. needed a new pumping system that could handle medium flows of industrial wastewater that was also skid mounted.
Marathon Petroleum|Robinson, IL|75 GPM - 125' TDH
The Marathon Petroleum Refinery in Robinson, IL needed this new industrial process water pump station to handle its medium flows of highly acidic water combined with standard wastewater. A precast concrete sump included an interior Tnemec coating to withstand the water chemistry from a refinery testing lab. 11 hp Goulds grinder pumps were designed in a duplex configuration and included a factory epoxy coating to withstand the water chemistry. The pump station piping was designed with stainless steel components, and corrosion resistant floats were included as the liquid level sensing devices.
Merck Animal Health|DeSoto, KS|100 GPM - 21' TDH
This industrial pumping system was designed to handle medium flows of process wastewater created from cleaning cycles at the Merck Animal Health facility. The wastewater was specified with highly variable pH conditions, so the pumping system was designed with a double-wall fiberglass sump with leak detection. All of the submersible components in the well were constructed of stainless steel, including the Tsurumi duplex submersible pumps. The pumping system electrical controls comprised a UL listed panel with SCADA integration.