The Michaels Mira Mesa project in San Diego, California was a new small stormwater lift station for commercial development.
Hastings, Nebraska - Biogas Wastewater Lift Station
The construction of a new Home Depot required a large detention pond and a new pump station to handle stormwater from the commercial development. This economical pump station uses 7.5hp Ebara pumps in a duplex configuration to meet the required flow rates to empty the detention pond. Parallel force mains were included with valve cans to provide simple and inexpensive piping and control valves. This submersible system uses cost-effective precast concrete barrels and a monolithic base to construct strong and reliable sump.
Tyngsborough, Massachusetts Commercial Sewer Lift Station
A commercial sewer lift station was designed for the Kendall Road Business Park in Tyngsborough, Massachusetts.
Cocoa, Florida – Private Wastewater Lift Station
26GPM
97′ TDH
V.C. Summer Nuclear Station|Jenkinsville, SC|35 GPM - 33.6' TDH
This package lift station was configured to handle low flows of industrial process water used for nuclear power generation. This lift station was one of the earliest systems to be installed during the construction of two new reactors at the plant. Submersible grinder pumps in a duplex configuration and a below grade valve assembly comprise the principal mechanical operations of the station. An outdoor control panel utilizes floats for primary liquid level-sensing, and an autodialer for communications and alarm notification.





