This was a true lift station replacement by installing a new package lift station “in the hole” of the removed wet well. Submersible pumps in a duplex configuration were included to meet the low sewage flows from the federal training facility. The system valves were installed in the discharge piping inside the wet well to reduce cost and simplify the system. An outdoor alternator panel handles the controls for this package lift station. It was designed with floats for liquid level sensing and a basic alarm.
Brixmor Properties - Commercial Pump Station
The Michaels Mira Mesa project in San Diego, California was a new small stormwater lift station for commercial development.
Hastings, Nebraska - Biogas Wastewater Lift Station
The construction of a new Home Depot required a large detention pond and a new pump station to handle stormwater from the commercial development. This economical pump station uses 7.5hp Ebara pumps in a duplex configuration to meet the required flow rates to empty the detention pond. Parallel force mains were included with valve cans to provide simple and inexpensive piping and control valves. This submersible system uses cost-effective precast concrete barrels and a monolithic base to construct strong and reliable sump.
Tyngsborough, Massachusetts Commercial Sewer Lift Station
A commercial sewer lift station was designed for the Kendall Road Business Park in Tyngsborough, Massachusetts.





