Green Sanitary District

Green Sanitary District | Roseburg, OR | 150 GPM - 56.8' TDH

jweddell100gpm - 300gpm, Collection Systems, Control Buildings Shelters, Municipal Collection, Pacific, Sewer System Expansion, Wastewater

A large book distribution center required the local municipal agency to install this package wastewater lift station. The force main was installed via a horizontally drilled hole to the exact elevation of the wet well connection. The submersible solids handling pumps are explosion proof to meet the hazardous area classifications for this lift station. A sheltered PLC control panel contains an intrinsically safe barrier to also meet the hazardous area requirements. The panel utilizes a pressure transducer and floats for primary and backup level-sensing controls.

Sacramento Municipal Utility District

Municipal Utility District | Sacramento, CA | 172 GPM - 94' TDH

jweddell100gpm - 300gpm, Detention Pond Pumping, Detention Ponds, Flood Control, Inlet Outlet Structures, Municipal Collection, Pacific, Stormwater Runoff, Wastewater

The newly constructed headquarters for the Sacramento Municipal Utility District purchased this package lift station to meet its medium sewage flow requirements. Submersible solids-handling pumps in a duplex configuration were specified in a deep well because this facility represents one of the ten largest public utilities in the country.

Wastewater Lift Station by Romtec Utilities for the USDA Fire District.

USDA Fire District|Bechwourth, CA|50 GPM - 70' TDH

jweddell50gpm - 100gpm, Municipal Collection, Pacific, Wastewater

This lift station was designed to meet the low sewage flow requirements of a municipal lift station that would also serve new construction and commercial buildings. Submersible cutter pumps in a duplex configuration and an inlet-line drop bowl provide reliable pumping capabilities, and a separate below-grade valve assembly holds the system valves. A sheltered alternator panel with a basic alarm manages the mechanical and electrical system controls. Liquid level-sensing is managed by float controls wired for intrinsically safe.

Clark County, Washington|Vancouver, WA|198 GPM - 51' TDH

jweddell100gpm - 300gpm, Mixed Use, Municipal Collection, Pacific, Sewer System Expansion, Urban Growth, Wastewater

This package lift station was designed to meet municipal standards for medium sewage flows at this new commercial complex. The duplex pump configuration and solids-handling pumps provide suitable preventative measures for a reliable and long-term wastewater lift station. The below-grade valve assembly included swing check valves, a pigging port, and flow meters. An on-site permanent generator and sheltered outdoor PLC control panel provide robust and programmable lift station controls. An ultrasonic transducer and a two float backup comprise the liquid level sensing controls.