City of Laguna Beach

The City of Laguna Beach|Laguna Beach, CA|600 GPM - 77' TDH

jweddell500gpm - 1,000gpm, Collection Systems, Design and Engineering, Grinder Vault, Pacific, Replacements & Retrofits, Slurry/Gritty Water, Wastewater

This high flow wet/dry lift station replacement was installed “in the sand” of Main Beach with three dry pit pumps in a 26-feet-deep precast rectangular vault. Triplex split case pumps, sump pumps, an intake/exhaust fan, lights, valves, stairs, and a mezzanine were all provided in the package. The Allen Bradley PLC control panel, flow transmitter, and junction box are located in a control building. Sophisticated SCADA, 3 levels of redundancy, auxiliary power, and an HDPE wet well are all primary components of this package lift station.

Trans Bay Cable

Trans Bay Cable|Pittsburg, CA | 500 GPM - 25' TDH

jweddell100-Year Storm, 500gpm - 1,000gpm, Collection Systems, Industrial, Industrial Process Water featured, Industrial Water, Pacific, Process Water, Stormwater, Stormwater Collection, Stormwater Featured, Transportation

Romtec Utilities designed and supplied two stormwater pump stations for a converter station in the City of Pittsburg, California. The two systems are necessary to supply collected stormwater to an onsite water treatment system before being discharged into the nearby bay.

Orange County Water District

Santa Ana Delhi | Orange County, CA

Hannah Duncan1,000gpm - 5,000gpm, 100-Year Storm, Collection Systems, First Flush, Flood Control, Pacific, Stormwater, Stormwater Collection, Stormwater Runoff, Treatment Plants, Wastewater, Water Reuse

This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.