Utica East Ohio Midstream LNG Plant|Kensington, OH|150 GPM - 59' TDH

jweddell50gpm - 100gpm, Eastern, Industrial, Industrial Water, Oil & Gas, Oily Water, Process Water, Stormwater, Stormwater Runoff

Utica East Ohio Midstream needed a new pump stations to handle low flows of stormwater runoff at its new Kensington Plant in Ohio. To responsibly contain potentially hazardous stormwater from the topsoil, this pump station was designed with a double-wall fiberglass wet well with interstitial leak detection. The pumping system also included corrosion resistant components and sensors due to the potential presences of LNGs in the stormwater runoff. Pumps were engineered with 7.5 hp Ebara pumps in a duplex configuration, and a UL listed control panel was supplied with added cable lengths for installation outside of NFPA classified spaces near the pump station.

Union Pacific Railroad|Cheyenne, WY|4,000 GPM - 25' TDH

jweddell1,000gpm - 5,000gpm, Design and Engineering, Detention Pond Pumping, Detention Ponds, Equipment Washdown, Mountain, Oil/Water Separators, Oily Water, Process Water, Railyards, Replacements & Retrofits, Retrofits, Stormwater, Stormwater Collection, Stormwater Featured, Stormwater Runoff

The Union Pacific Depot in Cheyenne, Wyoming needed two new stormwater pump stations to replace existing systems. The first station used Ebara 25 hp submersible pumps in a triplex configuration to handle stormwater runoff from a parking lot and additional drains. The second station used Ebara 7.5 hp submersible pumps in a duplex configuration to pump stormwater that drains from the pit of a railway turntable. Both systems include precast concrete valve vaults. Each vault was preassembled with Val-Matic Cam-Centric® plug valves, Val-Matic Swing-Flex® check valves, and Ashcroft pressure gauges. Both stormwater systems discharge into an evaporation pond that was installed as a part of this larger water collection replacement, which also included three additional Romtec Utilities wastewater lift stations.