The City of El Centro in California needed to replace an existing lift station that had been in service for over 40 years. The new system needed to handle high flows of wastewater from the county jail and from several residential developments in the area.
City of Victorville|Victorville, CA|75 GPM - 23.3' TDH
The City of Victorville needed to replace an existing lift station that had been converted to a manhole. The new lift station would handle medium flows of wastewater, and pump it uphill to gravity and off to treatment.
Sammamish Plateau|Issaquah, WA|Flow Metering Vault
An existing wastewater lift station owned by the Sammamish Plateau Water and Sewer District in Washington needed a new meter vault to track flows of sewage into an interceptor. The new meter vault was completely prefabricated by Romtec Utilities into a precast concrete vault structure, and it also includes a bypass line intended to bypass the existing lift station during maintenance and an eventual replace scheduled in upcoming years.
Bureau of Reclamation|Klamath Falls, OR|90 GPM - 20.0' TDH
The Bureau of Reclamation needed a new wastewater lift station to handle medium flows of wastewater in Klamath Falls, Oregon. This pumping system includes 2 hp Ebara submersible pumps engineered in a duplex configuration to meet the anticipated sewage flow and provide redundancy.
Westfield Valley Fair Mall|Santa Clara, CA|31 GPM - 10.7' TDH
The revitalization of a large mall in Santa Clara, CA required a new pump station to handle low flows of stormwater runoff from a section of the parking lot. This system utilized an economic design with a 4-foot ID precast concrete wet well, schedule 80 PVC discharge piping, and small ½ hp Weil pumps in a duplex configuration.





