Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH

jweddell5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Mixed Use, Mixed Use Development, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.

Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH

jweddell50gpm - 100gpm, 5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.