Romtec Utilities designed, prefabricated, and delivered a complete wastewater lift station for Village at 47th, a senior apartment development in Tukwila, Washington.
Leander, Texas - Triplex Stormwater Pump Station
The pump system was designed to meet city stormwater detention requirements, which required new developments to carefully manage runoff. After construction, stormwater must be collected and released at the same rate as it was before the site was developed.
Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH
The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.
1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH
NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.
Hancock Parkway Properties | 450 GPM - 15.8' TDH
The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.