The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.
1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH
NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.
Hancock Parkway Properties | 450 GPM - 15.8' TDH
The site of the new development is close to the Santa Clara River, driving the need for all the stormwater runoff to be collected and treated in order to keep contaminated water from making its way into the Santa Clara.
Microsoft | Silicon Valley, CA | 400 GPM - 20.5' TDH
Romtec Utilities supplied both the stormwater and the wastewater systems to achieve the “net-zero” usage goals on the project.
Beaverton, Oregon Commercial Mixed-Use Stormwater Lift Station
400 GPM
17.8′ TDH
Beaverton, Oregon Commercial Mixed-Use Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS For this commercial mixed-use stormwater lift station project in Beaverton, Oregon, a new development required a reliable pump system to manage stormwater runoff. Given Beaverton’s heavy rainfall during the winter and spring months, the system needed to be robust and efficient. The development includes a hotel, gas station, and large retail space. Stormwater is collected in an on-site detention pond and ...
- Page 1 of 2
- 1
- 2