Laguna Canyon Group|San Clemente, CA | 14 GPM - 22' TDH

jweddell5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Mixed Use, Mixed Use Development, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The development of multiple retail outlets in San Clemente, California required the installation of a stormwater pump station. The system needed to work with the specifications of another pumping system by discharging collected stormwater through an on-site biofiltration treatment system.

1025 Sweetwater Road|Spring Valley, CA| 200 GPM - 12.4' TDH

Hannah Duncan100-Year Storm, 100gpm - 300gpm, Commercial Development Stormwater, Flood Control, Groundwater Reclamation, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Water Reuse

NLA Spring Valley LLC was constructing a commercial development and in need of a stormwater lift station. This Romtec Utilities stormwater pump system was needed for small and 100-year storm events for a commercial development.

Commercial Mixed-Use Stormwater Lift Station in Beaverton

Beaverton, Oregon Commercial Mixed-Use Stormwater Lift Station

400 GPM
17.8′ TDH

jweddell300gpm - 500gpm, Commercial Development Stormwater, Detention Pond Pumping, Detention Ponds, Flood Control, Mixed Use Development, Pacific, Stormwater

Beaverton, Oregon Commercial Mixed-Use Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS For this commercial mixed-use stormwater lift station project in Beaverton, Oregon, a new development required a reliable pump system to manage stormwater runoff. Given Beaverton’s heavy rainfall during the winter and spring months, the system needed to be robust and efficient. The development includes a hotel, gas station, and large retail space. Stormwater is collected in an on-site detention pond and ...