Woodburn Development LLC, with ICON Construction and Development, Emerio Design, and Canby Excavations were in need of a wastewater lift station for a new development. The Romtec supplied waste water wet well is a precast 10’ inner diameter (ID) well that is 36’ in depth.
Rivers West Development|North Bend, WA| 130 GPM - 12.5' TDH
Romtec Utilities designed and supplied a stormwater pump station for a small housing development in North Bend, Washington.
Mitsubishi Manufacturing|Sacramento, CA|500 GPM - 15'-15.3' TDH
A Mitsubishi manufacturing plant in Sacramento, California needed two new matching pump stations to handle low-flows of stormwater from an on-site treatment system.
Sprouts at Mira Mesa|San Diego, CA|54 GPM - 29' TDH
Sprouts, a new health-focused grocery store at the Mira Mesa Mall in San Diego, California required a new stormwater pump station to handle low flows of stormwater.
Long Beach Exchange|Long Beach, CA|150 GPM - 15.9' - 18.7' TDH
Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California.





