The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.
Westfield Valley Fair Mall|Santa Clara, CA|31 GPM - 10.7' TDH
The revitalization of a large mall in Santa Clara, CA required a new pump station to handle low flows of stormwater runoff from a section of the parking lot. This system utilized an economic design with a 4-foot ID precast concrete wet well, schedule 80 PVC discharge piping, and small ½ hp Weil pumps in a duplex configuration.
Pomona College | Claremont, CA | 370 GPM - 14.5' TDH
Pomona College in Claremont, California needed this new stormwater pump station to handle a wide flow range of runoff.
Indian Springs Resort|Calistoga, CA|6,800 GPM - 15.7' TDH
The Indian Springs Resort needed a new pump station designed to handle high flows of stormwater runoff from a collection storm drain.
Contech Plant|Redding, CA|660 GPM - 24.3' TDH
Contech Engineered Solutions needed this pump station to pump medium flows of clean water from a Contech filtration system to a nearby treatment pond. This system was designed with 5 hp Ebara pumps in a duplex configuration. A precast concrete wet well includes a pedestrian rated hatch and safety grate for reliable fall protection. Valve “cans” were included in the design and supply of this system for an economical control valve option. The control panel was a UL listed device in an outdoor enclosure, including a pressure transducer control device for redundancy.





