City of Port Orchard Washington

City of Port Orchard|Port Orchard, WA|200 GPM - 64' TDH

jweddell100gpm - 300gpm, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

The McCormick Woods northern development purchased this lift station configured to meet the medium flow requirements for municipal sewage. This package lift station was needed because of the uneven terrain surrounding the development. Two submersible solids handling pumps pump to a below-grade valve assembly containing the lift station valves and access ports. A sheltered PLC control panel utilizes a pressure transducer for primary liquid level-sensing with backup float controls. The panel is tied to an onsite generator for emergency backup power.

Elsinore Valley Municipal Water District

Oak Springs Ranch | Wildomar, CA | 262 GPM - 53.9' TDH

jweddell100gpm - 300gpm, Apartment Complexes, Pacific, Residential Development, Wastewater

This packaged lift station was designed to meet the medium flows of sewage from an upscale apartment development. The concrete wet well was precast with Ameron T-Lock lining to protect the concrete from hydrogen-sulfide off-gassing. Ebara submersible sewage pumps in a duplex configuration provide redundant pumping capabilities suitable for the medium head conditions. This lift station also includes a bioxide odor control system in the design. A UL listed control panel provides the complete electrical controls with an autodialer for communications.

Eagle Park Acres|Madison County, IL|123 GPM - 21' TDH

jweddell100gpm - 300gpm, Central, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

A large neighborhood received these two lift stations that were designed to handle medium sewage flow requirements. The submersible solids-handling pumps in duplex configurations were specified to handle influent from three inlet lines from different sections of the neighborhood. The below-grade valve assemblies hold the system operation valves, bypass pumping ports, and shut-off valves. The outdoor UL listed control panels utilize pressure transducers and redundant float controls for liquid level-sensing; basic alarms were included for communications.

Bear River Band of the Rohnerville Rancheria

Tish Non Village|Eureka, CA|70 GPM - 21.6' TDH

jweddell50gpm - 100gpm, Municipal Collection, Pacific, Residential Development, Scalping & Membrane Bio-Reactor, Treatment Plants, Wastewater

The Bear River Band of Rohnerville Rancheria, a federally recognized tribe of the Mattole and Wiyot peoples, purchased this package wastewater lift station for a tribal community development. The submersible pumps are located in the bottom of a 14’ prefabricated fiberglass sump, and the below grade valve assembly is located in a 5’ deep round prefabricated fiberglass valve vault. An outdoor UL listed control panel includes floats for primary and backup level controls and an autodialer for system communications.

Sebastopol California

Burbank Housing|Sebastopol, CA|36 GPM - 26.8' TDH

jweddell5gpm - 50gpm, Municipal Collection, Pacific, Residential Development, Sewer System Expansion, Urban Growth, Wastewater

This wastewater lift station was required to hand medium sewage flows from a development neighborhood by Smith River Rancheria, the governing body of the Tolowa Dee-ni’ Tribe. Two Goulds Water Technology 2 hp grinder pumps were used to meet the high head requirements for over 3,000 ft of force main. A owner-supplied control building contains the control panel and an permanent onsite Cummins generator for backup power. A Mercoid pressure transducer provides primary level-sensing controls with Dwyer floats for backup.