Romtec Utilities supplies its customers with the best systems for the customers’ needs; the Highgate Community project is a project that required more than just a basic system. This is a Wastewater pump station in Bakersfield, California, constructed to serve a new development by Castle and Cooke.
McCormick Lift Station Upgrades| Port Orchard, WA | 3800 GPM - 142' TDH
The McCormick Lift Station #1 is an impressive site; on site are a 10’ inner diameter (ID) wet well, a precast rectangular dry pit, a fiberglass storage tank, a meter vault, a davit crane, a backup generator, and a control building to house the NEMA 12MCC controls and the Allen-Bradley CompactLogix controller.
Northshore Utility District|Kirkland, WA| 153 GPM - 130' TDH
Romtec Utilities was contacted to provide the design and supply of a sewer lift station to connect 12 newly constructed homes in the Seattle metropolitan area.
Clark County Water Reclamation District | Las Vegas, NV | 70 GPM - 47' TDH
Romtec Utilities designed and supplied a wastewater lift station for a housing development in Las Vegas, Nevada. Romtec Utilities worked with the developer, Summit Club Nevada, and the local water authority, Clark County Water Reclamation District (CCWRD), to design the system according to their design requirements.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.