A growing resort community with golf courses needed this Romtec Utilities package lift station to meet super high sewage flows with high head conditions. The resort has ample property for expansion and needed a wastewater lift station that would also expand. Two submersible solids handling pumps were included in the original supply, but the mounting hardware for a third pump in a triplex configuration was included to allow easy expansion as more condos are constructed. An outdoor control panel is protected by a shelter and utilizes a pressure transducer and backup floats for liquid level-sensing.
NPS, Navajo Nation, & White Dove, Inc | Chinle, AZ | 58 GPM - 97' TDH
This National Park Service lift station replacement was a “turnkey” project designed to meet commercial, municipal, and Navajo EPA standards for medium sewage flows. The design included chopper pumps in a duplex configuration, an inlet-line drop bowl, and a separate below-grade valve assembly.