Stevens Pass Ski Resort – Fast Lift Station Retrofit
Project Description
Romtec Utilities designed and supplied this wastewater lift station retrofit to meet the medium sewage flows at the Stevens Pass Ski Resort. A major part of the retrofit supply package were two Vaughan submersible chopper pumps for wastewater. The electrical controls were the next significant portion of the retrofit. The PLC controller included a touchscreen HMI with autodialer telemetry and SCADA options to communicate with the resort treatment plant. This communication provides advance notification for the treatment plant as the lift station is nearly inaccessible during winter months.
What Romtec Utilities Provided
- Lift Station Design & Engineering
- Package Lift Station Supplier
- Package Lift Station Manufacturer
- On-Site Start-Up Management
65 | 35′ |
GPM | TDH |
Why They Chose Romtec Utilities
Working with West Coast Engineering, Romtec Utilities designed this complete lift station retrofit to rehabilitate an existing system serving condos at the resort. Steven’s Pass Ski Resort needed this retrofit to be designed and supplied in a short time frame to be ready for the ski season. The retrofit also needed to be very robust and reliable because snow makes accessibility difficult during the winter months. Romtec Utilities designed the retrofit to meet these needs and also to meet the needs of the installing contractor, KRCI LLC. The design, manufacture, and supply was accomplished very quickly and met all the needs and requirements of Steven’s Pass, West Coast Engineering, and KRCI LLC.