This project is a new lift station handling low flows in the Santa Ana Delhi Channel in Newport Beach, California. This system collects stormwater in a 10’ inner diameter (ID) wet well that reaches 32’ in depth. In the bottom of the well, three Ebara 20 horsepower (HP) submersible pumps sit ready to pump out the water.
Irrigation Systems
Irrigation Systems Description: Romtec Utilities designs complete pump stations for irrigation water pumping applications with all structural, mechanical, electrical, and communication systems included. Romtec Utilities designs irrigation pump stations with any required pump technology, including turbine pumps, submersible centrifugal pumps, axial flow pumps, and many more. From deep wells to water intake structures, Romtec Utilities can design and supply your irrigation water system as a single integrated package. Typical Irrigation Systems Applications: Pumping Scenarios Deep ...
Public Municipal
Public & Municipal City of Beaumont | Wastewater Package Pump Station 467 GPM | 99.3′ TDH The pump station was designed to the City of Beaumont’s standards which have adopted Eastern Municipal Water District requirements, as the city will also be the end owner of the system. Read More San Bernardino Municipal Water Department | Wastewater Lift Station 188 GPM | 20.4′ TDH The recent Washington Avenue Lift Station project in San Bernardino, California, began ...
Commercial
Commercial Recent Projects Brixmor Property Group | Commercial Pump Station 5 GPM | 9.1′ TDH The Michaels Mira Mesa project in San Diego, California was a new small stormwater lift station for commercial development. Brixmor Property Group is the owner of the development. Read More Commercial City of Madera, CA | Wastewater Lift Station 550 GPM | 25′ TDH The Valley Knolls Development in Carson City, Nevada required a new wastewater station to service the ...
Mountain
Mountain Arizona Navajo Tribal Utility Authority | Turnkey Lift Station Replacement 58 GPM | 97′ TDH This National Park Service lift station replacement was a “turnkey” project designed to meet commercial, municipal, and Navajo EPA standards for medium sewage flows. The design included chopper pumps in a duplex configuration, an inlet-line drop bowl, and a separate below-grade valve assembly. Read More Pinal County, AZ | Residential Wastewater Lift Station Project The Bella Vista Farms is ...