The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Manchester|Port Orchard, WA|195-265 GPM - 21'-37' TDH
Romtec Utilities provided 3 wastewater lift stations for Manchester Residential Area outside of Seattle, WA.
Clear Creek Tahoe|Carson City, NV|99 - 165 GPM - 224.7' - 267' TDH
The new residential development at Clear Creek Tahoe needed two new wastewater lift stations. The location of the development has many elevation changes and to successfully pump the sewage off to treatment, two lift stations were necessary.
Naval Base Kitsap|Bremerton, WA|100-1,160 GPM - 40'-130' TDH
Romtec Utilities designed, engineered, and manufactured five unique lift stations for the Naval Base Kitsap in Washington.
Camphora Lift Station|Soledad, CA|140 GPM - 137.6' TDH
Romtec Utilities designed and supplied a wastewater lift station for an apartment complex in Soledad, California. This lift station pumps into an existing force main owned by the nearby Soledad Prison.