City of Shafter in California

The City of Shafter|Shafter, CA|400 GPM - 28.5' TDH

Hannah Duncan100gpm - 300gpm, 300gpm - 500gpm, 500gpm - 1,000gpm, Pacific, Replacements & Retrofits, Wastewater

A suburb of the City of Shafter required a lift station package to repair and rehabilitate an existing wastewater sump. Duplex submersible centrifugal pumps and discharge pipe mounting brackets were fitted to a concrete slab poured in the bottom of the existing manhole. The Romtec Utilities package included the proper components to operate in this 26-foot-deep sump. An outdoor MultiSmart control panel utilizes conductive probes for primary and backup level controls and an autodialer for communications. This retrofit package saved about 60% the cost of a new lift station.

army post wastewater

USACE Prime Power|St. Roberts, MO|300 GPM - 143' TDH

jweddell100gpm - 300gpm, BABA, Central, Military Installations, Wastewater

These package lift stations were designed to meet the high head pumping requirements for this training facility of the US Army Corps of Engineers. For one station with over 7,000 ft. of 8” force main, 35 hp duplex submersible centrifugal pumps were supplied to achieve the 300 gpm flow rate . The second lift station used smaller, 4 hp duplex grinder pumps to meet its pumping requirements. Outdoor UL listed control panels utilize float controls for level-sensing and soft starters to provide advanced pump diagnostics and to reduce inrush currents. Autodialers were specified for communications.