Romtec worked with Marquess & Associates to provide them with the best value from an engineering, construction, and overall cost of maintenance standpoint.
City of Hesperia |Hesperia, CA| 700 GPM - 150' TDH
The City of Hesperia Booster station receives water from the Victor Valley Reclamation facility, which discharges reclaimed water into tanks adjacent to the booster station.
Town of Samoa|Samoa, CA| 1000, 200-600 GPM - 150' TDH
Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.
Southgate Water District|Lone Tree, CO| 125 GPM - 75' TDH
Romtec Utilities designed and supplied a booster pump station and an integrated control building for an upscale development. This booster system regulates water pressure for the newly constructed homes.
River Ridge Apartments|Tualatin, OR|270 GPM - 100' TDH
A new apartment complex required a booster pump station for maintaining the water pressure of potable water for the apartments. The booster station used 5 hp Goulds stainless steel, multi-stage pumps in a triplex configuration.