The Stringfield at Granite Mountain site sits above much of the surrounding area, creating extreme elevation challenges for water delivery. Because of this, a basic water system using gravity alone would not work. Instead, a booster pump station and lift station system was needed to move water uphill and keep pressure consistent throughout the development.
Canyon Park|Monrovia, California|60 GPM - 17.7' TDH
The Canyon Park lift station and booster skid project represents a successful partnership between Romtec Utilities, the City of Monrovia, and Merrell Johnson Engineering. By delivering a fully engineered, prefabricated system, Romtec Utilities helped the city modernize its wastewater infrastructure with minimal disruption and maximum reliability.
Town of Samoa|Samoa, CA| 1000, 200-600 GPM - 150' TDH
Romtec Utilities was contacted to provide a design service order for a new booster pump station and control building for a housing development in the Town of Samoa. This booster pump station was designed to meet the immediate and future flow requirements of the development as it continued to expand.
City of Hesperia |Hesperia, CA| 700 GPM - 150' TDH
The City of Hesperia Booster station receives water from the Victor Valley Reclamation facility, which discharges reclaimed water into tanks adjacent to the booster station.
River Ridge Apartments|Tualatin, OR|270 GPM - 100' TDH
A new apartment complex required a booster pump station for maintaining the water pressure of potable water for the apartments. The booster station used 5 hp Goulds stainless steel, multi-stage pumps in a triplex configuration.