The PDX TCORE pump station is the fifth project RU has done for the Port of Portland in the last five years. The station is the main wastewater pump station for all of PDX.
Portland International Airport|Portland, OR|3600 GPM - 46.4' TDH
The construction of a new multi-level parking garage at the Portland International Airport (PDX) required a stormwater pump station to handle high flows of stormwater.
Port of Portland|Portland, OR|18,140 GPM - 10.62' TDH
The Portland International Airport (PDX) needed a very large pump station to discharge high volumes of stormwater to a runoff creek from one of its runways.
Portland Airport|Portland, OR|100 GPM - 28.19' TDH
To accommodate a new private terminal and hanger, Portland Airport needed a new wastewater lift station to handle a medium flow of sewage from the new buildings.
City of Santa Barbara|Santa Barbara, CA|1,500 GPM - 66' TDH
This lift station serves a large area and was installed at Santa Barbara Municipal Airport as part of a larger project. Two submersible solids handling pumps are supported by a jockey pump that acts as a sump pump for periods of low flow. An impressive control building contains the UL listed control panel, a backup diesel generator and automatic transfer switch, electric meter main, and ferrous chloride odor controls. The electrical controls interface directly with the existing detailed SCADA system used by the Goleta Sanitary District.