Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
City of Shafter|Shafter, CA|350 GPM - 19.6' TDH
The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.
Pioneer Place|Ridgefield, WA|350 GPM - 116' TDH
A new residential development in Ridgefield, Washington needed a wastewater lift station to handle medium flows of sewage from the new houses. 23 hp Flygt submersible pumps were engineered in a duplex configuration to meet the expected peak flow rates.
Pomona College | Claremont, CA | 370 GPM - 14.5' TDH
Pomona College in Claremont, California needed this new stormwater pump station to handle a wide flow range of runoff.
Kelso Village | Kelso, WA | 308 GPM - 112' TDH
A new development for a commercial park needed this wastewater lift station to connect the development to the municipal sewer system. Submersible centrifugal pumps in a duplex configuration were engineered to meet the medium flow high head conditions of the force main. This system needs to pump at a predefined flow rate in order to achieve the minimum force to reach the existing municipal sewer lines. The lift station control panel is a UL listed panel with redundant float controls wired for intrinsically safe use.




