A residential development project in 2008 needed a new lift station to handle medium flows of sewage from the houses. The development was put on hold, and in 2013, Romtec Utilities supplied equipment to make the lift station operational.
Taverner Ridge|Ridgefield, WA|330 GPM - 118' TDH
Romtec Utilities designed, engineered, and manufactured a package wastewater lift station for a new housing development in Ridgefield, Washington.
City of Shafter|Shafter, CA|350 GPM - 19.6' TDH
The City of Shafter in California needed a new sewer lift station to replace an existing system with out-of-date components.
Pioneer Place|Ridgefield, WA|350 GPM - 116' TDH
A new residential development in Ridgefield, Washington needed a wastewater lift station to handle medium flows of sewage from the new houses. 23 hp Flygt submersible pumps were engineered in a duplex configuration to meet the expected peak flow rates.
Pomona College | Claremont, CA | 370 GPM - 14.5' TDH
Pomona College in Claremont, California needed this new stormwater pump station to handle a wide flow range of runoff.




