Kings Mountain Energy Center

Middletown Energy Center|Middletown, OH|40 GPM - 25' TDH

jweddell5gpm - 50gpm, Corrosive/ Caustic Pumping, Eastern, High Temperatures, High/Low pH, HRSG Blowdown, HRSG Pumping, Industrial, Industrial Water, Power Generation, Process Water

Construction of a new combined cycle power plant in Middletown, OH required 3 pump stations for the operation of its HRSG system. Middletown Energy Center uses natural gas and HRSG to generate power, this process requires significant amounts of water for operation.

Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH

jweddell50gpm - 100gpm, 5gpm - 50gpm, Commercial Development Stormwater, Flood Control, Modular Wetlands, Pacific, Parking Lot Drainage, Stormwater, Stormwater Collection, Stormwater Runoff, Stormwater Treatment

The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.