The City of Bremerton needed a new sewer lift station to handle medium flows of wastewater from a new residential development.
Union Pacific Railroad|Cheyenne, WY|100 GPM - 22' TDH
The Union Pacific Depot in Cheyenne, Wyoming needed two new sewer lift stations to replace its existing sewer collection system. Each lift station included three precast concrete vault structures, a wet well, valve vault, and metering vault. Both systems use 2 hp Ebara Vortex® sewage pumps in duplex configurations that are explosions proof rated for Class I, Division I locations. The valve assemblies comprise Val-Matic Cam-Centric® plug valves and Swing-Flex® check valves with pressure gauges. Endress and Hauser PROline® electromagnetic flow meters measure the sewage flows for both lift stations. These in-ground valve and meter assemblies were fitted with heat tracing to provide reliable frost protection with Raychem and Digitrace components.
Green Sanitary District | Roseburg, OR | 150 GPM - 56.8' TDH
A large book distribution center required the local municipal agency to install this package wastewater lift station. The force main was installed via a horizontally drilled hole to the exact elevation of the wet well connection. The submersible solids handling pumps are explosion proof to meet the hazardous area classifications for this lift station. A sheltered PLC control panel contains an intrinsically safe barrier to also meet the hazardous area requirements. The panel utilizes a pressure transducer and floats for primary and backup level-sensing controls.
- Page 2 of 2
- 1
- 2


