Seismic upgrades to the Washington County Public Service Building required the installation of five stormwater pump stations.
Portland International Airport|Portland, OR|3600 GPM - 46.4' TDH
The construction of a new multi-level parking garage at the Portland International Airport (PDX) required a stormwater pump station to handle high flows of stormwater.
Sage Apartments|Cerritos, CA|23, 2850 GPM - 25.4', 17.5' TDH
Sage at Cerritos is a new luxury apartment complex in Cerritos, California, a suburb of Los Angeles. Romtec Utilities provided two stormwater pump stations for this residential development aptly referred to as “big stormwater” and “little stormwater”.
Port of Portland|Portland, OR|18,140 GPM - 10.62' TDH
The Portland International Airport (PDX) needed a very large pump station to discharge high volumes of stormwater to a runoff creek from one of its runways.
Bay 101|San Jose, CA|31-187 GPM - 10.2'-20.6' TDH
The new Bay 101 casino required 6 stormwater pump stations to handle low flows of stormwater in San Jose, California. Each pump station will help serve new hotels as this casino facility expands. These pump stations needed to meet the low flow requirements while maintaining consistent head conditions.




