Romtec Utilities was hired to design and supply a wastewater lift station to expand the sewer infrastructure in Ridgefield, WA. The lift station was for an expansion of a commercial distribution center for United Natural Foods, Inc. or UNFI. Clark Regional Wastewater District, CRWWD, is the local water authority and needed to expand its sewer system for future residential development in this area of Ridgefield
City of Vancouver | Vancouver, WA | 272 GPM - 161.3' TDH
Romtec Utilities was contacted to provide a package wastewater lift station for Columbia Palisades, a mixed-use development in Vancouver, Washington. This large development project by Airpark Development will transform 84-acres of an old rock quarry into an urban neighborhood with residential units, commercial spaces, and offices.
Clark Regional Wastewater District | Vancouver, WA | 392 GPM - 88.6' TDH
Romtec Utilities was contacted to provide the design and supply of a wastewater lift station as a complete package for a new housing development in Vancouver, Washington. The location of the development required Romtec Utilities to adhere to the robust design standards of the Clark Regional Wastewater District (CRWWD) for new lift stations.
City of Junction City|Junction City, OR| 335 GPM - 128' TDH
Romtec Utilities designed and supplied a wastewater lift station and control building to replace an existing municipal sewer system in the City of Junction City, Oregon.
Kitsap County | Bremerton, WA | 130 GPM - 61.4' TDH
Romtec Utilities was hired to provide the design and supply of a wastewater lift station for Settlers Field, a new residential development in Bremerton, Washington, across the sound from Seattle.





