The Stringfield at Granite Mountain site sits above much of the surrounding area, creating extreme elevation challenges for water delivery. Because of this, a basic water system using gravity alone would not work. Instead, a booster pump station and lift station system was needed to move water uphill and keep pressure consistent throughout the development.
Eldorado Housing Development|Kitsap County, WA|189.5 GPM - 119.5' TDH
Romtec Utilities partnered with LGI Homes to deliver a complete residential wastewater pump station for the Eldorado housing development in Kitsap County, Washington. Initially the scope only included Eldorado, but the system was expanded to include the adjacent development, Verbarendse.
City of Lemoore|City of Lemoore, CA| 311 GPM - 16.5' TDH
Romtec Utilities designed, supplied, and installed a wastewater lift station for a new housing development in Lemoore, California. The lift station connects to the city sewer with medium flows of wastewater to treatment.
City of Shafter|Shafter, CA| 414 GPM - 27.5' TDH
Romtec Utilities was contacted to design and supply a replacement wastewater lift station for the City of Shafter in Rodriguez Park. The new system was needed to handle growing flows from the area while modernizing the infrastructure.
San Bernardino Municipal Water Department| San Bernardino, CA| 188 GPM - 20.4' TDH
The recent Washington Avenue Lift Station project in San Bernardino, California, began as a retrofit and ultimately ended as a full system replacement.