This stormwater pump station is part of the Santa Clara Valley Transportation Authority’s (VTA) stormwater reclamation system.
Long Beach Exchange|Long Beach, CA|150 GPM - 15.9' - 18.7' TDH
Romtec Utilities designed and supplied five stormwater pump stations for a new commercial development in Long Beach, California.
Boardwalk Pipeline Partners|Houston, TX|100 GPM - 11' TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
City of Los Angeles|Marina del Rey, CA|200 GPM - 15' TDH
The City of Los Angeles needed to construct a new 54” force main to increase sewer capacity and add redundancy to an existing 48” force main at Marina del Rey.
Port of Portland|Portland, OR|18,140 GPM - 10.62' TDH
The Portland International Airport (PDX) needed a very large pump station to discharge high volumes of stormwater to a runoff creek from one of its runways.