In order to expand the municipal sewer system, this lift station was configured to pump to an existing gravity line flowing to treatment. A 24-foot-deep by 10-foot-diameter wet well collects the sewage flows. The wastewater is pumped at 120 gpm 10,000 lineal feet of 10” force main against 206’ TDH with 23 hp high head submersible solids handling pumps. A sheltered control panel utilizes an intrinsically safe barrier for in-well electrical, such as the pressure transducer and conductive probe for primary and backup level controls.
West Mesa Industrial Park|Las Cruses, NM|733 GPM - 44' TDH
The US Army Corps of Engineers worked with Romtec Utilities to design this lift station to replace an existing septic system. The resulting package wastewater lift station met the high sewage flows of this publicly owned industrial complex. The submersible sewage pumps in a duplex configuration are explosion proof to meet the wet well space classification. An outdoor UL listed panel utilizes floats and a pressure transducer for intrinsically safe level controls. It also includes an autodialer for communications and a blower for odor control.
The City of Clovis | Clovis, NM | 100 GPM - 15.4' TDH
An expanding sewer system for annexed land required this packaged wastewater lift station. Duplex submersible solids handling pumps are designed to meet the medium flow requirements and pass solids up to a 2” diameter. To save space, the system valves are integrated into the discharge piping in the sump. An outdoor control panel utilizes floats for liquid level-sensing and an intrinsically safe barrier for in-well electrical components. The electrical controls are wall mounted.
US Marine Corps Base|Camp Pendleton, CA|1,585 GPM - 25' TDH
The Marine Corps Base Camp Pendleton needed this large wet-dry wastewater lift station to replace an existing system to allow the construction of new enlisted quarters. The new lift station included triplex dry-pit pumps to handle super-high flows of sewage from the facilities. An 8’ diameter precast concrete sump collects the sewage. Suction lines connect the sump to a 200-square-foot rectangular dry pit where the pumps, flow meter, and valve assembly are located. This lift station also includes an upstream grinder pit with a Macho Monster sewage grinder to pulverize solids into passable sizes.
Fresh & Easy Distribution Center|Riverside, CA|170 GPM - 60' TDH
The expansion of this distribution center for Fresh and Easy food products required a package lift station designed to meet medium wastewater flow requirements. This lift station for the 88-acre storage and supply facility uses an inlet line drop bowl to protect submersible solids-handling pumps in a duplex configuration from cascading influent and turbidity. A below-grade valve vault holds all the valves assembly for two, parallel force mains. An outdoor UL listed control panel utilizes float controls for liquid level-sensing and includes an autodialer for communications.