Lift Station in Kimberly, Idaho

Kimberly, Idaho Residential Lift Station – Olsen Farms

113 GPM
35.3′ TDH

jweddell100gpm - 300gpm, Mountain, Residential, Residential Development, Wastewater

Kimberly, ID - Olsen Farms Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Idaho Residential Lift Station Project Description Kimberly is a city in Idaho within Twin Falls County near Twin Falls along U.S. Route 30 which needed a lift station for a new residential development. The population of Kimberly was 4,626 as of the 2020 census. It is within the Twin Falls metropolitan area which had a population of 114,291 at the 2020 census. Kimberly ...
industrial plant pumping system

Mesa, AZ – Industrial Pumping System

jweddellIndustrial, Industrial Process Water featured, Industrial Water, Mountain, Wastewater

Mesa, Arizona Industrial Water Package Pump Station Industrial Plant Pump System For this industrial water package pump station, Romtec Utilities designed a industrial plant pumping system to meet the needs for an industrial plant in Mesa, Arizona. The system for the plant required many identical pumping systems to pump both wastewater runoff and runoff from their cutting machinery. We utilized stainless steel sumps due to the abrasiveness of the water. At Romtec Utilities we design, ...

Phoenix, Arizona – Wildlife Rehabilitation Facility Lift Station

60 GPM
23′ TDH

jweddell50gpm - 100gpm, Mountain, Wastewater

Phoenix, Arizona - Wildlife Rehabilitation Facility Lift Station Wildlife Rehabilitation Facility Lift Station Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Wildlife Rehabilitation Facility Lift Station Romtec Utilities provided The Wildlife Rehabilitation Facility lift station in Phoenix, Arizona. SBL Engineering, LLC worked with Romtec Utilities to provide a wastewater lift station for the wildlife rehabilitation facility when it was developing its location. SBL Engineering originated in Arizona. They provide civil engineering services in the metropolitan area along ...
Subdivision Wastewater Lift Station Design

Pinal County, Arizona Subdivision Wastewater Lift Station

199GPM
99′ TDH

jweddellMountain, Residential Development, Wastewater

Pinal County, Arizona Subdivision Wastewater Lift Station Project Assets PANEL DESIGN Subdivision Wastewater Lift Station Design The contractor needed to get the subdivision’s wastewater lift station designed, manufactured, delivered, installed, and operational as quickly as possible. Initially, they were sourcing all materials independently but reached out to us specifically for the control panel, level sensing, generator, and ATS. Although we typically manage the full design and supply of such systems, we agreed to focus solely ...