The City of Shafter wanted a pumping system that met their standards and will be operated and maintained by the city.
Visalia, California Logistics Wastewater Lift Station
50 GPM
35′ TDH
Visalia, California Logistics Wastewater Lift Station Logistics Facility Wastewater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This logistics facility wastewater lift station in Visalia, California services a development by CapRock Partners. We worked with Caprock before on their HLA6 logistics facility, and they followed up directly with us after the completion of that project to get the design on this lift station started. This project is for a logistics building sewer lift station ...
Ontario, California Now and Future Pump System
100 GPM
24.5′ TDH
Ontario, California Now and Future Pump System Now and Future Pump System Design DESIGN DRAWINGS PANEL DESIGN SITE-PLANS This project was unique because it is a now and future pump system for the Inland Empire in California. Romtec Utilities designed the system with the potential to add larger pumps in the future depending on the expansion of the sewer system in that area. It is an intelligent strategy for long-term growth to engineer a system ...
Vernon, California Data Center Stormwater Lift Station
1312 GPM
14.7′ TDH
Vernon, California Data Center Stormwater Lift Station Data Center Stormwater Lift Station Design DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Data Center Stormwater Lift Station Vernon, California needed a data center stormwater lift station for the new Prime Data Center. Kimley Horn contacted Romtec Utilities looking for assistance with a stormwater pump station for Prime Data Center in Vernon, CA. The project is privately funded, and the lift station will remain privately owned. Romtec Utilities provided “preliminary ...
Davis, California – 55+ Residential Development Stormwater Lift Station
4000 GPM
15.8′ TDH
Davis, California - 55+ Residential Development Stormwater Lift Station Stormwater Lift Station Project Assets DESIGN DRAWINGS PANEL DESIGN SITE-PLANS Romtec Utilities designed and supplied a 55+ residential development stormwater lift station for the Bretton Woods community in Davis, California. This publicly owned pump system serves a 247-home active older adult community with a clubhouse, pool, bocce ball court, and walking trails. Romtec Utilities worked with Bretton Woods, LLC, Cunningham Engineering, DeNova Homes and the City ...





